MAYNARD GREEN STREET | SEATTLE, WA

MAYNARD GREEN STREET | SEATTLE, WA

Owner: Interim Community Development Association
SvR Role: Landscape Architecture & Civil Engineering
Construction Cost: $230,000
Start Date: 10/2005
End Date: 10/2010

SvR was hired by the Interim Community Development Association for both civil engineering and landscape architecture services. This block-long project is funded in part through the Neighborhood Sidewalk Fund and several grants. For the street retrofit, runoff from the roof of an adjacent building flows into a cistern at the top of the block. The water then flows into a series of stormwater planters, where it is slowly filtered and detained before entering the municipal system. The sidewalk was also widened and seat walls were created to improve access and provide resting spots for pedestrians making the climb up the 16% street grade. Plantings were selected that blended with the character of the International District neighborhood’s historical roots. 

SvR coordinated with the urban designer and several artists in developing the integrated site concept and art elements, which include photo tiles and a kiosk. 

IMG_0837.jpg
IMGP4593.JPG
DSC00809.JPG